| CIT
Aerospace |
B737-300 |
1
A/C |
| Project Engineering,
Supplied, Manufactured, Procured & Modified
FAA Certified Reconfiguration kit to reconfigure
from a two class configuration to all economy
and replace existing KSSU Galleys with Atlas
Galleys. Provided Engineering Order, LOPA,
Emergency Equipment drawing and FAA Form 8110-3
Certification. |
| |
| GECAS |
DC10-30 |
8 A/C |
| Project Engineering,
Supplied, Manufactured, Overhauled, &
Procured Douglas Centerline Bin Kits. Provided
Engineering Order, LOPA, Emergency Equipment
drawing and FAA Form 8110-3 Certification. |
| |
| ICON Capital |
B737-400 |
1 A/C |
| Project Engineering,
Supplied, Manufactured, Overhauled and Procured
FAA Certified Reconfiguration kit to remove
the ‘F’ Lavatory, Install an ‘A’
Lavatory and take the aircraft from a two-class
configuration to an all economy 170Y configuration.
Including all floor structure, plumbing, service
panel and electrical installations. Provided
Engineering Order, LOPA, Emergency Equipment
drawing and FAA Form 8110-3 Certification. |
| |
| GECAS |
MD-80 |
10 A/C |
| Project Engineering,
Supplied, Manufactured, Procured & Modified
Reconfiguration kits including: Galleys, Lavatory,
Stowage Bins, PSUs & Spacer Panels, Sidewall
Panels, Ceiling Panels Support Structure.
Provided Engineering Order, LOPA, Emergency
Equipment drawing and FAA Form 8110-3 Certification. |
| |
|